The HIVE is a building project developed at the Building Research Park designed to support research into construction materials.
The Building Research Park is an open-to-the-elements facility at Wroughton Airfield, that offers the capability of full-scale research into building materials and systems using 16 re-configurable research buildings. It is part of the BRE Centre for Innovative Construction Materials (BRE CICM).
The HIVE aims to answer fundamental questions about the resilience and performance of sustainable materials. It looks at pre-prototype solutions at Technology Readiness Level 2-5, carrying out the fundamental research that will influence industry practice and enable the uptake of innovative products and solutions. The facility is open to researchers across the world and has been designed to be completely flexible.
Facilities include:
- A controlled full-scale indoor air quality room where researchers are looking at building panels that absorb and sequester pollutants.
- A double-storey cell that allows investigation of the multi-level aspects of façade efficiency.
- The bladder cell that can be used for testing small panels.
- The flood cell which allows researchers to test the impact of flooding on building materials and systems. With increased flooding across the UK the research taking place at the HIVE can inform some of the major resilience challenges facing the UK construction industry. These include how best to dry out the materials, how much material can be salvaged and crucially how to balance the need to get people back in their homes as quickly as possible without affecting the structural performance of the building.
Projects underway at the HIVE include:
- Investigating photo-catalytic materials to harvest ambient light to generate energy.
- ECOSEE, which aims to enlarge the market for bio-based materials with negative carbon impact.
- The HEMPSEC project for market replication of a pre-fabricated hemp-lime system.
This article was created by --BRE_Buzz. It based on a post originally published on BRE Buzz in October 2015 written by Ali Nicholl.
You can see the original article here.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Airtightness of energy efficient buildings.
- Anatomy of low carbon retrofits: evidence from owner-occupied superhomes.
- BRE articles on Designing Buildings Wiki.
- BRE National Solar Centre.
- BRE Üserhuus.
- Building Research Establishment BRE.
- Design for deconstruction, BRE modular show house.
- Design for deconstruction, office building.
- Pre-demolition and pre-refurbishment audits.
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.